How did you even find this place?
0 Members and 1 Guest are viewing this topic.
[20:21:13] xar: i was just thinking about the time iago came over here and we made this huge bomb and light up the sky for 6 min[20:21:15] xar: that was funny
(22:15:39) Newby: it hurts to swallow
mutsumibear: David's coming over Sunday so we can have mad sex all day.zxdropoff: lucky youmutsumibear: I know.mutsumibear: I just pray I don't start my period before then.zxdropoff: omfgzxdropoff: stfuzxdropoff: now pleasemutsumibear: HAHAmutsumibear: I love disturbing you.
The new switchgear includes computer controls that monitor power quality, said Assistant Utilities Manager John Arrowsmith as he explained the electrical outage."It's designed to open a breaker on that tieline if voltage drops, so that an alternate tieline can provide power without interruption to prevent damage to customer's equipment," he said. "There are two tielines, or feed connections, and because the second tieline is not connected, the open breaker resulted in a total loss of power to the switchgear. The second tieline is expected to be completed the end of this month."